Cryptomathic : 21. July 2025
The EU and US now agree on which post-quantum algorithms to use – NIST FIPS 203/204/205 – but not when they must be deployed.
On 23 June, Brussels set a hard 31 Dec 2030 deadline for critical infrastructure, five years earlier than Washington’s “2035 or sooner” target.
Any EU-based critical infrastructure provider has just over five years to complete its migration.
If your PKI can swap algorithms on the fly, a standards shift becomes a simple config change – not a forklift upgrade.
Our three-minute demo shows exactly how.
Watch a live upgrade from RSA to ML-DSA (FIPS 204) with zero downtime – all within Cryptomathic's CrystalKey 360.
Key takeaways:
The regulatory clocks are ticking. Fortunately, both sides of the Atlantic agree on the algorithms – giving you a clear four-year runway (2026–2030) to migrate, once, without disruption – if you build crypto-agility today.